
Our Business

Coal Operational (OPS)

Biomass Operational (OPS)

Coal Under Construction (UC)

Gas Operational (OPS)

Hydro Operational (OPS)

Wind Operational (OPS)


DHPL (Hydro) - 9.5MW

IBEUL (Coal) - 700MW

IBEL (Biomass) - 6MW

AERL (Natural Gas) - 150MW

IBPGL (Coal) - 189MW

IBTPL (Coal) - 450MW (300 MW)
IBPML (Coal) - 660MW

IBPIL (Wind) - 0.75MW

IBETL (Biomass) - 20MW


RRREL (Biomass) - 28MW
IBEML (Biomass) - 20MW

Operational
Projects | Fuel Type | Capacity (MW) |
---|---|---|
Ind-Barath Thermal Power Limited – Phase I | Coal | 300 |
Ind-Barath Power Gencom Limited | Coal | 189 |
Arkay Energy Rameswaram Limited | Gas | 150 |
Ind-Barath Energies (Maharashtra) Limited | Biomass | 20 |
Ind-Barath Energies Thoothukkudi Limited | Biomass | 20 |
Raghu Rama Renewable Energy Limited | Biomass | 18 |
Ind-Barath Energies Limited | Biomass | 6 |
Dharmshala Hydro Power Limited | Hydro | 9.5 |
Ind-Barath Power Infra Limited | Wind | 0.75 |
Total | 713 |
Under Construction
Projects | Fuel Type | Capacity (MW) |
---|---|---|
Ind-Barath Power (Madras) Limited – Phase I | Coal | 660 |
Ind-Barath Thermal Power Limited – Phase II | Coal | 150 |
Ind-Barath Energy (Utkal) Limited - Phase I | Coal | 700 |
Total | 1,510 |
Under Development
Projects | Fuel Type | Capacity (MW) |
---|---|---|
Ind-Barath Energy (Utkal) Limited - Phase II | Coal | 660 |
Ind-Barath Power (Madras) Limited – Phase I | Coal | 660 |
Arkay Energy Rameswaram Limited - Expansion | Gas | 35 |
Total | 1,355 | |
Grand Totall | 3,578 |