Coal
   Gas
   Renewable
   Performance
   CDM
 

Projects in Operation

Feedstock Capacity (MW)

Ind-Barath Power Gencom Limited

Coal

189.0

Ind-Barath Thermal Power Limited

Coal

300.0

Arkay Energy (Rameswarm) Limited

Natural Gas

132.0

Ind-Barath Energies Thoothukkudi Limited

Biomass

20.0

Ind-Barath Energies Maharashtra Limited

Biomass

20.0

Raghu Rama Renewable Energy Limited

Biomass

18.0

Ind-Barath Energies Limited

Biomass

6.0

Dharmshala Hydro Power Limited

Hydro

9.5

Ind-Barath Power Infra Limited

Wind

0.75

Total

695.25

 
 

Projects Under Implementation

Feedstock Capacity (MW)

Ind-Barath Energy (Utkal) Limited, Phase - I

Coal

700.0

Ind-Barath Power (Madras) Limited, Phase - I

Coal

660.0

Ind-Barath Thermal Power Limited

Coal

150.0

Arkay Energy (Rameswarm) Limited - Expansion

Natural Gas

26.2

Total

1536.2

 
 

Planned Projects

Feedstock Capacity (MW)

Ind-Barath Energy (Utkal) Limited, Phase - II

Coal

660.0

Ind-Barath Power (Madras) Limited, Phase - II

Coal

660.0

Arkay Energy (Rameswarm) Limited - Expansion

Natural Gas

19.26

Total

1339.26

 
 

Designed by: Build Infotech Solutions Pvt. Ltd.

 
Ind-Barath Power Infra Limited (IBPIL), INDIA.
All Rights Reserved.